Installation and Testing 185,000 SF Manufacturing Facility
Quality, efficiency and production were critical to this manufacturer. JESCO, Inc. provided the mechanical-electrical design and construction on this 185,000 square foot manufacturing facility. The air conditioning system consisted of 1,200 tons of roof mounted equipment designed for temperature and humidity control. Efficient high bay lighting was used to insure proper lighting levels at production locations.
|