Archive for Construction-Engineering

CarMax – The Automotive Superstore

CarMax, the largest used-car retailer in the U. S., worked with JESCO to construct this new facility under an aggressive five month schedule. This facility is built upon a green field of approximately six acres which was at a low elevation along a creek. Between 50,000 and 60,000 cubic yards of fill material was brought […]

read more

Ag-Bio Engineering Building

The Biomedical Engineering building is the first building to be constructed in the Ag / Science Commons area on the historic campus of Mississippi State University. Conveniently located in the center of campus, the design incorporates the characteristics of many of the vintage buildings in the area. The diverse complex incorporates classrooms, teaching labs, research […]

read more

Roll Form Group, Inc. (USA)

Roll Form Group, a Division of Samuel, is a manufacturer of steel products located at the Yellow Creek Port. Through the design-build process, JESCO, Inc. constructed this 140,000 square foot manufacturing facility. This project showcased massive equipment foundations, process trenches, uncoiler foundations, flying saw foundations, and looping pits ranging in depth to 16’ below finish floor. The […]

read more

Montgomery Regional Airport

This was an approximately 100,000 square foot renovation and addition involving demolition of much of the old structure and adding new facilities. Exterior glass curtain wall surrounds most of the new areas. Brick, precast stone and dryvit were also used on the exterior. Elevators and escalators were added for the new second story waiting areas. […]

read more

RSA Headquarters Office Building

This new office building is an eight-story, 270,000 square foot facility to house the Retirement Systems of Alabama, Alabama Criminal Justice, and State Employees Insurance Board. The building is a concrete frame, post tension structure with precast and curtain wall exterior skin. The roofing is single ply and metal roofing. Interior finishes include granite flooring […]

read more

Robert Trent Jones Club House

Organized baseball left Montgomery’s Paterson Field after the 1980 season, but the city was ready for its return with this Minor League Class AA Stadium for the Tampa Bay Devil Rays. Riverwalk Stadium was built on the site of an old railyard. The railroad company’s offices and shed, erected in 1898, were converted into team […]

read more

Montgomery Riverwalk Stadium

Organized baseball left Montgomery’s Paterson Field after the 1980 season, but the city was ready for its return with this Minor League Class AA Stadium for the Tampa Bay Devil Rays. Riverwalk Stadium was built on the site of an old railyard. The railroad company’s offices and shed, erected in 1898, were converted into team […]

read more

Peco Foods, Inc.

PECO Foods is the eighth largest poultry producer in the United States. They are a privately held and family managed organization. Company wide PECO Foods processes 24 million pounds of poultry per week.  At peak production, their new 420,000 SF state-of-the-art facility in Randolph County, AR can process 1.5 million ten pound broiler chickens per […]

read more

Legends Hotel & Conference Center

Located on the Senator Course of the Robert Trent Jones Golf Trail site, Capitol Hill in Prattville, Alabama, the new ballroom was constructed to seat six hundred guests at any one time. The room can also be divided into as many as five smaller salons using the retractable air walls. A new 5,000 square foot […]

read more

Mall at Barnes Crossing

JESCO’s Construction-Engineering Division in Fulton, Mississippi, worked with The Mall at Barnes Crossing to provide construction services for multiple projects in various mall areas including the construction of a new Barnes & Noble book store. Stores with new faces and exterior mall entrances included JoS A. Bank, Coldwater Creek, and Ulta. The store entrances within […]

read more

Riverview Plaza

This Retirement Systems of Alabama Property located in downtown Mobile, was renovated to conform to Marriott Renaissance requirements. Phase I of this project consisted of a complete interior renovation of three hundred seventy five guestrooms, including a Presidential and Governor’s Suite. Phase II included total renovation of the public spaces, including ballrooms, meeting rooms, restaurant, […]

read more

Itawamba Community College

The project consists of two (2) structures (the Davis Arena Building) and (the Fitness Building), totaling approximately 119,500 square feet. The foundations for both buildings rest on concrete piling, a total of 379 piling with a 16 inch diameter that penetrate the earth as deep as 60 feet. More than three miles of concrete pilings […]

read more